FusionCore expertise

ELV & Low-Current Integration

Coordinate the systems that share a building’s low-current infrastructure. Clear boundaries, routes and handover records help IT, facilities and contractors deliver one workable installation.

Request a quotation ↗
Commercial building cutaway illustrating low-current cabling, Wi-Fi, CCTV and access connections
Conceptual service illustration

A defined scope

Built for your
environment.

01

Integrated project scope

Review data networks, wireless, CCTV and relevant access systems as connected packages. Identify interfaces and define which contractor supplies, installs, configures and validates each part.

02

Pathways and coordination

Coordinate racks, containment, mounting locations, network ports and power dependencies with the wider construction team. Drawings need to reflect accessible routes and maintainable equipment positions.

03

Testing and handover

Agree system-specific acceptance checks, labels, as-built records and user training. Integration is complete when the people operating the building understand the delivered scope.

The delivery path

Clear from
the beginning.

We work from project drawings, BOQs and interface requirements. Site conditions, construction sequence and dependencies influence both scope and scheduling. Specialized systems and approvals are confirmed with responsible stakeholders rather than assumed to be part of every low-current package.

  1. 01Define packages
  2. 02Coordinate routes
  3. 03Install and integrate
  4. 04Commission and hand over
ELV & Low-Current Integration: a typical planning and handover sequence. Final steps follow the agreed project scope.

Handover expectations

What to
agree.

  • Defined packages and interface responsibilities
  • Coordinated installation and configuration scope
  • Testing/commissioning records as agreed
  • As-built and operational handover documentation

Prepare your enquiry

What to
share.

  • Project drawings and BOQ
  • System list and interface requirements
  • Construction schedule and access arrangements
  • Acceptance criteria and documentation format

Frequently asked questions

Before you begin.

Can contractors send an ELV BOQ for quotation?

Yes. Include drawings, specifications, location, quantities and required interfaces. Ambiguous or incomplete lines may need clarification or a site review.

Can FusionCore work as an IT subcontractor?

A subcontracting engagement can be discussed for a clearly defined scope. Package responsibilities, commercial terms, site access and delivery expectations must be agreed.

Do you support testing and project handover?

Testing, commissioning support and documentation can be included where they match the agreed package. State the required checks, records and format in the RFQ.

Useful before procurement

Browse all guides ↗