Structured Cabling

Build the physical foundation for reliable networks. A cabling project should connect the right locations, follow a documented design and be tested before your team depends on it.

Request a quotation ↗
Organized patch panels and structured copper cabling inside a commercial network rack
Conceptual service illustration

A defined scope

Built for your
environment.

01

Copper and fiber infrastructure

Scope Cat6 or Cat6A outlets, fiber backbones and links between communications rooms. Cable selection follows application needs, distances, route constraints and the wider network design.

02

Racks and cable pathways

Plan rack space, patch panels, cable managers, containment and accessible routes. Coordinate pathways, power, room conditions and building access with the project team.

03

Testing and handover

Agree the test method and acceptance criteria before installation. Link identifiers, outlet labels, test records and as-built layouts make maintenance easier after handover.

The delivery path

Clear from
the beginning.

We begin with floor plans, outlet quantities and a site review. A priced scope separates cable, connectivity, containment, rack work, testing and reinstatement so procurement can compare like-for-like proposals. Hidden route conditions and out-of-hours access are discussed rather than assumed.

  1. 01Outlet schedule
  2. 02Cable pathways
  3. 03Terminate and label
  4. 04Test and hand over
Structured Cabling: a typical planning and handover sequence. Final steps follow the agreed project scope.

Handover expectations

What to
agree.

  • Outlet and rack schedule
  • Installation scope and material breakdown
  • Testing records to agreed acceptance criteria
  • Cable labels and as-built documentation

Prepare your enquiry

What to
share.

  • Floor plan and outlet/BOQ schedule
  • Cat6, Cat6A or fiber requirements
  • Rack locations and route access
  • Testing standard and handover expectations

Frequently asked questions

Before you begin.

Can you quote from a BOQ?

Yes. Send the BOQ, drawings, location and installation requirements. We may need a site review or clarification of pathways, test requirements and quantities before issuing a final scope.

Should my office use Cat6 or Cat6A?

The choice depends on bandwidth targets, link length, future upgrades and route capacity. Cat6A supports 10GBASE-T over a standard 100-metre channel; Cat6 may suit gigabit office links. Evaluate the complete installation, not only cable price.

Are testing and labeling included?

They can be included as explicit deliverables. Ask for the test type, link naming convention, results format and as-built records to be stated in the proposal.